Live Updates COVID-19 CASES
  • USA 7,130,121
    USA
    Confirmed: 7,130,121
    Active: 2,542,490
    Recovered: 4,381,300
    Death: 206,331
  • Brazil 4,624,885
    Brazil
    Confirmed: 4,624,885
    Active: 540,281
    Recovered: 3,945,627
    Death: 138,977
  • Canada 147,522
    Canada
    Confirmed: 147,522
    Active: 10,858
    Recovered: 127,422
    Death: 9,242
  • Portugal 70,465
    Portugal
    Confirmed: 70,465
    Active: 22,247
    Recovered: 46,290
    Death: 1,928
  • Mozambique 7,262
    Mozambique
    Confirmed: 7,262
    Active: 2,863
    Recovered: 4,350
    Death: 49
  • Cabo Verde 5,412
    Cabo Verde
    Confirmed: 5,412
    Active: 521
    Recovered: 4,837
    Death: 54
  • Angola 4,363
    Angola
    Confirmed: 4,363
    Active: 2,731
    Recovered: 1,473
    Death: 159
  • Timor-Leste 27
    Timor-Leste
    Confirmed: 27
    Active: N/A
    Recovered: 27
    Death: N/A
Keep us connected

MassDOT Board Approves Orange Bridge Replacement Contract

The MassDOT Board of Directors approved the awarding of a bridge construction contract to replace the Route 2 over Route 202 Bridge in Orange. The $18 million project will consist of three stages of construction to repair the current structurally-deficient bridge. The bridge will be   …Continue Reading MassDOT Board Approves Orange Bridge Replacement Contract
Source: Mass gov

LusoAds - Advertisement
LusoAds – Advertisement



Share.

About Author

Leave a Reply

en_USEnglish
pt_PTPortuguês en_USEnglish